  • Which of the following is not included in piping checks?
  • Do Construction Manager's services typically include functional verification that installed systems meet design intent?
  • Which Appendix contains the Glossary of Acronyms?
  • Which of the following is included in the commissioning scope for HVAC systems?
  • Which process is used to clean piping lines by injecting steam to remove debris before commissioning?
  • ACG recommends to (clearly / not clearly) define the responsibilities of the commissioning authority and the owner from the outset.
  • When calibrating controls against measured air or water flows, which two contractors must collaborate?
  • In which phase are the O&M staff trained for effective, ongoing operations?
  • Which term is abbreviated BAS and refers to the central management of building systems?
  • In commissioning, which acronym stands for the authority who leads the process?
  • Who reviews and approves acceptance phase documents?
  • Which item from the Retro/Re-Commissioning planning phase is explicitly aimed at understanding control logic?
  • During which phase are Owner training programs and materials planned for building operations?
  • Who is responsible for directing, witnessing, and documenting the functional performance testing?
  • What does AO stand for?
  • What does ASTM stand for?
  • Which role handles project scheduling, manages overall completion of work, coordinates contractors, and maintains specified building conditions?
  • The commissioning process typically follows which procurement step?
  • Which statement about the construction model Plan and spec, Design- Build is true?
  • Which statement about commissioning cost ranges is correct?
  • In which phase is documentation updated as required?
  • The acronym CA stands for which term in commissioning contexts?
  • RFT stands for?
  • ACG stands for which commissioning group name?
  • What are the two main items regarding construction commissioning during the post-acceptance phase?
  • Which Appendix focuses on contractor responsibilities for HVAC commissioning?
  • PC stands for which term?
  • ASHRAE Guideline 0 - 2005 is titled what?
  • What is Chapter 2 of the ACG Cx Guideline?
  • Who attends Construction Phase meetings?
  • What does the acronym FPT stand for?
  • Outside Air is abbreviated as which of the following?
  • What are the six main items regarding construction commissioning during the construction phase?
  • Which abbreviation is associated with the USGBC trademarked 'Green Building Rating System'?
  • Who distributes SPQC Reports in the Construction Phase?
  • The Cx Plan (is / is not) updated during the life of a project to reflect changes in planning, design, construction, and occupancy and operations.
  • Which term does the abbreviation EMS stand for?
  • Which item does not typically occur during turnover/handover?
  • Design Phase Attend Meetings?
  • Which topic is typically addressed in the Owner's Project Requirements (OPR)?
  • Who is responsible for Construction Phase Collect Manuf. Checklists?
  • The final commissioning report uses which document as its template?
  • Which component of the Cx plan focuses on training the building's operations staff?
  • Which of the following is included in the RFP to cover extra work?
  • PM stands for?
  • SMACNA stands for which organization?
  • What does CxM stand for?
  • SC stands for which term?
  • AABC stands for which organization?
  • Which professional designation is abbreviated as PE?
  • In Construction HVAC commissioning, which phase requires carrying out and documenting any required "off season" functional performance tests and revising the final commissioning report, if required?
  • What is the typical range of savings in operating costs when comparing a commissioned building to a non-commissioned building?
  • Who is responsible for the Post-Acceptance Phase 11th Month Review?
  • A stands for which term?
  • SVC stands for which term used in commissioning and verification processes?
  • Which of the following is an example of documentation updated during the Design Phase Commissioning Process?
  • What are the four tasks when performing a design review?
  • In the Post-Acceptance Phase, who oversees Direct Warranty Issues?
  • Define Re-Commissioning.
  • Which item distinguishes LEED EA Credit 3 Enhanced Commissioning from Prereq 1?
  • Who is responsible for the Design Phase Draft FPTs?
  • Which of the following is a listed benefit of commissioning?
  • Which item is NOT a main construction-phase activity?
  • Which of the following is NOT an acceptance-phase item?
  • In the Construction phase, which deliverable is produced?
  • Who is responsible for Construction Phase Distribute SVCs?
  • ANSI stands for which organization?
  • EC stands for which term?
  • EE stands for which term?
  • Commissioning starts at the inception of a building project during which phase?
  • PM stands for?
  • Which document communicates progress to stakeholders during the commissioning process?
  • What do system verification checks (SVCs) do?
  • Name the different construction models.
  • Who is responsible for the Construction Phase Pre-Construction Meeting?
  • Which Appendix contains the Sample Format for System Verification and Start-up Checklists?
  • Functional performance tests need to show correct operation under which operation modes?
  • What does ASHRAE stand for?
  • Describe the progression of functional performance testing.
  • AO stands for which term?
  • Which role is described as providing SVCs, monitoring system start-ups, and conducting FPTs?
  • Who is tasked with collecting manufacturer checklists during Construction Phase?
  • SMACNA stands for?
  • Who is responsible for Construction Phase Monitor Controls Install?
  • ASI stands for which term?
  • Who is responsible for Construction Phase Approve SVCs?
  • In which phase does the CxA review contractor submittals occur?
  • Chemical cleaning uses high pressure water to remove chemical residue.
  • CO stands for?
  • During the Acceptance Phase, who conducts Direct Re-Testing?
  • In the Retro/Re-Commissioning Planning phase, which activity involves reviewing system operation and control sequences in detail?
  • Which role is responsible for the Acceptance Phase Cx Report?
  • Which option describes coordination efforts during the construction phase?
  • What does the acronym RTF stand for?
  • Who performs Site Observations during the Construction Phase?
  • Which of the following is a potential negative consequence of Construction HVAC Cx when planning is deficient?
  • The acronym OPR stands for which owner's project requirements set?
  • The abbreviation ES stands for which term?
  • In which phase is seasonal testing performed?
  • In which phase is full documentation provided?
  • Which phase includes the activity 'Commissioning authority writes the commissioning plan'?
  • AABC is the abbreviation for which organization?
  • Which guideline describes the technical requirements for applying the commissioning process described in Guideline 0?
  • Which chapter addresses HVAC Commissioning in Existing Buildings?
  • Who is responsible for Construction Phase Review O&M Documents?
  • Which port configurations characterize common ball valves?
  • Who is responsible for Construction Phase Approve SVC Updates?
  • When does the Occupancy and Operations Phase begin?
  • Spring hangers prevent pipes from moving.
  • RFQ stands for what in commissioning terminology?
  • Which activity is included in the post-acceptance phase?
  • Which acronym denotes the supply path for condenser water?
  • What does PFC stand for?
  • What does ACG recommend regarding defining responsibilities between the commissioning authority and the owner?
  • During the Planning phase, which activity is listed as identifying the scope of commissioning?
  • Which acronym stands for AO in control systems?
  • ISO represents which organization?
  • Which Appendix provides a Sample Request for Proposal for Commissioning Services?
  • What does CFR stand for?
  • Which role coordinates electrical installation with mechanical work, attends meetings, documents progress (SVCs), operates systems as required for FPTing, and plans and delivers O&M staff training and manuals?
  • In which project phase are design reviews performed?
  • During the Retro/Re-Commissioning Implementation phase, which statement best reflects typical applicability?
  • Which of the following is a typical member of the HVAC Commissioning Team from construction phase through project end?
  • LEED stands for?
  • Which post-acceptance activity focuses on monitoring after occupancy?
  • In the Design phase, which activity ensures coordination of the commissioning process with the project schedule and meetings?
  • What does the acronym MDE stand for in common engineering job titles?
  • Which chapter covers Construction HVAC Commissioning?
  • Which items are included in the Construction HVAC Commissioning phases?
  • What does LVP stand for?
  • BAS stands for which term?
  • Define Commissioning.
  • Who is responsible for reviewing the DID/OPR during the Pre-Design Phase?
  • In instrumentation, which statement regarding AI and AO is correct?
  • ___ and ___ are essential for effective teamwork.
  • Who is responsible for identifying systems to be commissioned during the Design Phase?
  • Which term is abbreviated as O&M and is used for manuals detailing operation and maintenance procedures?
  • Globe valves do not have bonnetts.
  • What is total building commissioning (TBCx)?
  • In retrocommissioning implementation phase, which activity involves performing TAB on existing?
  • Which statement best describes the purpose of commissioning?
  • Who handles direct re-testing during the Acceptance Phase?
  • A ______ valve opens by lifting a wedge out.
  • In the design phase, the Basis of Design is verified against which document?
  • What does the acronym SVC stand for?
  • Who is responsible for approving RTFs during the Construction Phase?
  • ANSI represents which organization?
  • BAS stands for which term?
  • Retrocommissioning costs as a percentage of total operation cost range from what?
  • GLOBE is a valve type best described as which option?
  • LEED is a trademarked term associated with which organization?
  • What are the six main items regarding retrocommissioning during the planning phase?
  • The CxA (is or is not) an inspector?
  • Which role is designated to supervise witnessing installation tests during the Construction Phase?
  • Construction Phase Pre-TAB Report Review?
  • During the Construction phase, which task is performed as part of Commissioning?
  • During the Design Phase, what does the Cx Team verify?
  • PECI stands for which organization?
  • Who is responsible for Construction Phase Cx Schedule Updates?
  • Which action is explicitly listed as part of the Acceptance phase’s tasks?
  • What does ASME stand for?
  • The term NES is used to denote which of the following?
  • Which organization certifies TBEs?
  • In which phase are document systems verification checks carried out?
  • The frequency of Cx Process Progress Reports could vary; a general guide is one progress report for every how many Cx Team meetings?
  • Who is responsible for Coordination Meetings in the Construction Phase?
  • During the Comprehensive Commissioning Construction phase, which activity is performed?
  • In which phase does TAB agency complete and document test and balance work?
  • Which term is expanded by CT in HVAC systems?
  • The commissioning process should indicate financial responsibilities in the event of failed or aborted functional performance tests between which two entities?
  • Globe valves have bonnetts.
  • Who prepares the Cx Outline in the Pre-Design Phase?
  • What does DID stand for?
  • ACCA stands for which organization?
  • QC stands for which term?
  • Which document is abbreviated as O&M, referring to facility documents?
  • Which role is responsible for Acceptance Phase Implement FPTs?
  • NFPA stands for?
  • ES stands for which type of entity?
  • In the same progression, which stage follows ‘interfaces between HVAC systems’?
  • Gate valves have rising stems.
  • Which is a commissioning benefit related to documentation?
  • Which organization name corresponds to the acronym PECI?
  • CHWS stands for which term?
  • At a minimum, when does the Occupancy and Operations Phase end?
  • Which phase is responsible for checking submittals?
  • Who is responsible for Construction Phase Write SPQC Reports?
  • New construction commissioning costs as a percentage of total comprehensive HVAC construction cost range from which of the following?
  • FPT stands for?
  • RFP stands for?
  • Who is responsible for Post-Acceptance Phase Direct Warranty Issues?
  • What is the primary purpose of the commissioning process as described?
  • During Construction Commissioning (Implementation) activities, which task is performed?
  • During the Acceptance Phase, who tracks RFIs, COs, and SIs?
  • What does Cx stand for?
  • Which acronym stands for the role that balances HVAC systems?
  • Who is responsible for distributing the FPT summary during the Acceptance Phase?
  • Which activity is characteristic of the Construction phase in the Commissioning process?
  • In which phase is the commissioning team formed?
  • Who is responsible for implementing re-testing during the Acceptance Phase?
  • AHJ stands for which phrase in commissioning terminology?
  • In maintenance leadership roles, what does MM stand for?
  • In which phase are test procedures (FPTs) developed?
  • Which role is responsible for Acceptance Phase TAB Verification?
  • In Construction HVAC Commissioning, which phase includes carrying out and documenting functional performance tests, verifying TAB results, training O&M staff, and submitting the final commissioning report?
  • Who attends meetings related to Cx activities in the Pre-Design Phase?
  • What does PC CQC stand for?
  • Which document contains main topics like Introduction, Cost/Benefit Analysis, and Selecting a Provider within the ACG Cx Guideline?
  • Before start-up, the contractor must complete the associated SVC.
  • Who writes the commissioning plan?
  • Which three items are required to be completed in order for the commissioning process to be completed?
  • Which phase involves expanding the systems manual outline?
  • Who is responsible for Construction Phase Update SVCs?
  • CxA represents which credential?
  • Do Designers’ (A/E) services typically include field verification that their design works as intended?
  • Which statement about full port ball valves is true?
  • Which role is described as providing Cx plan and Cx specification, and coordinating design changes with the owner and end-users?
  • Who is responsible for approving SPQC Reports during the Construction Phase?
  • Who is responsible for Acceptance Phase Implement FPTs?
  • Who is responsible for Construction Phase Distribute FPTs?
  • What does IPM stand for?
  • Which information should be included in the RFQ regarding communication with the selection team?
  • Which item is not among the four main pre-design items for comprehensive commissioning?
  • The CxA has a distinct responsibility to whom?
  • The CxA is not just another layer of inspection, but a catalyst for?
  • The benefits of commissioning typically continue for how long?
  • Who is responsible for Construction Phase Document Control?
  • Which statement about commissioning origin is true?
  • What does CWR stand for?
  • Who is the intended audience for the ACG Commissioning Guideline?
  • Which role is primarily responsible for coordinating project scheduling and maintaining specified building conditions?
  • Which expansion corresponds to QA?
  • Which of the following is a pre-design phase focus for comprehensive commissioning?
  • IAQ stands for?
  • P&ID diagrams do not have a compass in the left upper corner.
  • What does SMACNA stand for?
  • Which acronym denotes the central VA administrative office?
  • Who is responsible for Construction Phase Cx Schedule Integration?
  • The AABC Commissioning Group (ACG) was established in which year?
  • A design error contradiction between ISO drawing and P&ID notation would be found in which punch list category?
  • Identify a typical team member of the Cx Team.
  • What is the heart of the commissioning process?
  • The _____ _____ provides the information needed to understand, operate, and maintain the systems and assemblies?
  • Which item is explicitly listed as a member of the HVAC Commissioning Team's O&M context?
  • Hand cleaning is often the only method to clean pipes greater than 60 inches in diameter?
  • DID stands for?
  • What does PC stand for?
  • In which phase are the Owner training requirements developed?
  • Which document addresses the Owner's Project Requirements (OPR) and reflects the defined scope and budget for the commissioning process?
  • In HVAC commissioning, what does TAB stand for?
  • Which term is used to describe commissioning activities in existing buildings aimed at diagnosing ongoing problems or supporting planned maintenance?
  • During Construction Commissioning (Planning), which activity is performed?
  • Which phase has coordination of the Cx process through the project schedule, Cx plan, and commissioning meetings?
  • What does the acronym ACG stand for?
  • What document is used to describe the selection criteria and the notification protocol for respondents?
  • Who is responsible for Post-Acceptance Phase Implement Re-Testing?
  • What are the four primary documentation requirements for the Design Phase Commissioning Process?
  • Who is responsible for Acceptance Phase Direct Re-Testing?
  • The sequence and timing of commissioning activities must be incorporated into the overall project _____.
  • BOD stands for which term?
  • Which item in the Cx plan addresses what documentation must be produced?
  • What type of Cx typically occurs for a building renovation?
  • Who is responsible for both coordination and progress meetings during the Construction Phase?
  • Which statement best describes the relationship between the OPR and the Commissioning Plan?
  • What is a systems manual?
  • TBE refers to which role in commissioning activities?
  • TAB work is completed and documented in which phase?
  • Which chapter addresses HVAC Commissioning in Existing Buildings?
  • Under a plan and spec comprehensive HVAC commissioning organizational structure, who does the Owner hire independently?
  • In the Pre-design phase, who does the Owner select?
  • The _____ _____ forms the core of the final commissioning report.
  • What is a typical commissioning deliverable at project close?
  • Which form is used to track the resolution of issues found during commissioning?
  • Who is responsible for Construction Phase Update FPTs?
  • Who reviews the DID/OPR in the Pre-Design Phase?
  • During the Acceptance Phase, which role tracks RFIs, COs, and SIs?
  • Commissioning activities should be integrated into the construction schedule.
  • What does TCC stand for?
  • Who coordinates the commissioning process through the commissioning plan, commissioning meeting, and schedule?
  • In which phase is the O&M staff trained for ongoing operations and maintenance of all systems?
  • What are the four main items regarding construction commissioning during the acceptance phase?
  • When does construction HVAC commissioning start?
  • What does ANSI stand for?
  • Who writes SPQC Reports in the Construction Phase?
  • During the Acceptance Phase, who monitors field reports?
  • What does the acronym ATC stand for in building system terminology?
  • Which Chapter of the ACG guideline identifies detailed methodology for Retro/Re-Commissioning?
  • During HVAC functional performance testing, what is the responsibility of the CxA?
  • What does CC stand for?
  • Which activity is part of Construction Commissioning (Planning)?
  • Which phase is the Final project Cx Process Report produced?
  • DO stands for?
  • During acceptance, which activity primarily ensures the operating staff can maintain the systems?
  • Which acronym describes a control approach using digital signals to manage building systems?
  • Which acronym represents the VA Resident Engineer?
  • In retrocommissioning planning phase, which activity involves reviewing existing documentation?
  • In which phase are submittals reviewed and verified?
  • What are the four main items regarding retrocommissioning during the implementation phase?
  • Which abbreviation stands for Contracting Officer Representative?
  • What is the purpose of ASHRAE Guideline 0?
  • What is included in the RFP as part of project documentation development and distribution?
  • During the design phase, which primary document tracks evolving issues and their resolutions?
  • In the progression of functional performance testing, which stage follows ‘complete systems’?
  • A meaningful and useful Owner training program typically includes using the operation and maintenance components of the _____ _____ as the basis of development.
  • FM stands for which role in building operations?
  • Which action is performed by the commissioning authority during the design phase?
  • Who identifies what systems to commission?
  • Which role facilitates O&M training during the Acceptance Phase?
  • Which role reviews design for adequate testing provisions, submits TAB data sheets for approval, coordinates work with master schedule, reviews site conditions prior to field work, submits complete and accurate TAB report, and participates in TAB verification?
  • Which Chapter of the ACG guideline identifies detailed methodology for Comprehensive HVAC Commissioning?
  • TAB is an abbreviation used to denote which process in building systems commissioning?
  • Who is responsible for the Design Phase Attend Meetings?
  • Who is responsible for Construction Phase Monitor Project Team Field Reports?
  • The abbreviation EE is used for which position?
  • What does AABC stand for?
  • Which statement describes owner advocacy in design and construction decisions?
  • Which chapter deals with Construction HVAC Commissioning?
  • Who is responsible for Acceptance Phase TAB Verification?
  • Which Appendix contains the Sample Functional Performance Test Checklists?
  • What does ELEC represent in common abbreviations?
  • In energy-management abbreviations, NES stands for which term?
  • Retro-commissioning is identical to re-commissioning except that it occurs when what condition is true?
  • What does CxR stand for?
  • What does NFPA stand for?
  • In a traditional plan and spec project, the commissioning authority typically reports directly to whom?
  • Which party is responsible for Construction Phase Schedule Integration?
  • In LEED EA Credit 3 Enhanced Commissioning, which verification is included regarding occupant training?
  • Who is responsible for Construction Phase Review Submittals?
  • Which acronym is used to document issue resolutions in commissioning?
  • Which item is listed as a Pre-Design activity?
  • In the Retro/Re-Commissioning Planning phase, which item is the final step?
  • Which term describes a centralized control system for building services?
  • Who is responsible for Construction Phase Track RFIs/COs/SIs?
  • Which acronym refers to the controls that automatically modulate HVAC equipment?
  • What does DN stand for in commissioning terminology?
  • Which acronym corresponds to testing that verifies equipment operates according to design?
  • How many benefits are listed for a preventive maintenance program (PM)?
  • What does VAMC stand for?
  • Which describes the typical balance of activities in commissioning: balance systems, document and verify results, and perform functional performance tests on all HVAC systems included in the scope?
  • Who is responsible for document control during the Pre-Design Phase?
  • FP stands for which term related to safety and protection?
  • In which phase is the OPR and BOD verified?
  • For TAB projects, which contracting arrangement is recommended?
  • In which phase are deficiencies corrected, and re-testing carried out?
  • What does re-commissioning (ReCx) refer to?
  • Which item is a main design-phase activity?
  • Which is a commissioning benefit related to energy usage?
  • What does the acronym FPT stand for in commissioning terminology?
  • What does AABC stand for?
  • What is one of the purposes of the ACG Commissioning Guideline?
  • In which phase is the warranty review conducted?
  • What is the purpose of a Request for Qualifications (RFQ) in commissioning?
  • BEE stands for which term?
  • In mechanical projects, the acronym ME is commonly expanded as which role?
  • Which statement best describes a stated reason for HVAC commissioning in existing buildings beyond diagnosing problems and as part of a preventive maintenance program?
  • CC TV stands for?
  • Which acronym stands for Subcontractor?
  • Who is responsible for distributing RTFs during the Construction Phase?
  • Who performs the commissioning team role that includes communicating project requirements to the design team, coordinating facilities and staff participation, and conducting regular site observations?
  • What does SI stand for?
  • Which abbreviation equals Construction Manager Responsibility?
  • What contains detailed descriptions of design, installation, or performance issues that are at variance with the OPR?
  • Which acronym stands for the 'Resolution tracking form'?
  • Who is accountable for developing the Cx scope during the Pre-Design Phase?
  • Which role reviews design, provides Cx plan and Cx spec, conducts site visits, provides SVCs, monitors system start-ups, conducts FPTs, and reviews O&M documents and training?
  • Which acronym maps to 'Prime Contractor Construction Quality Controller'?
  • The commissioning process provides verification that the ______ are implemented in both the ______ and ______. Which two terms correctly complete this statement?
  • CxA stands for which role in commissioning projects?
  • Which chapter is titled Comprehensive HVAC Commissioning?
  • Who is responsible for Acceptance Phase Implement FPTs?
  • Which aids the installers by providing specific information on the OPRs for equipment and assemblies to support long-term operation?
  • Which chapter addresses Commissioning of Non-HVAC Building Systems?
  • O&M stands for?
  • Who is responsible for Construction Phase Facilitate Start-Up of Commissioned Systems?
  • Who is responsible for attending meetings during the Pre-Design Phase?
  • In a commissioning process, which document defines how the commissioning activities will be organized and executed?
  • SVC stands for?
  • Define ACG.
  • During which phase are Owner training requirements developed?
  • Which acronym refers to the organization that certifies green building practices in the United States?
  • BDE stands for which term?
  • Which phase follows Acceptance?
  • Which skill set is explicitly listed as necessary for HVAC commissioning agencies?
  • What is the primary method used during the Construction Phase to verify that installed systems and assemblies comply with the OPR?
  • Which abbreviation stands for Closed Circuit TV?
  • Which phase is most closely associated with finalizing the Final project Cx Process Report?
  • What does PMG stand for?
  • What does FPT stand for in the context of commissioning, defined as testing the DDC/BAS/EMS in every possible condition and verifying correct equipment response?
  • EBCx stands for?
  • What does NICET stand for?
  • Which acronym corresponds to Outside Air used for ventilation?
  • Which role handles Update SVCs during the Construction Phase?
  • ASHRAE Guideline 1 - 1996 is titled what?
  • Who is responsible for Acceptance Phase Direct FPTs?
  • What does GA stand for?
  • A major negative consequence often associated with construction-based commissioning is that it eliminates pre-design and design phase planning?
  • CMR stands for?
  • Which role designs and completes controls install as required by DID/OPR, documents progress (SVCs), coordinates with TAB, operates systems as required for FPTing, and plans and delivers O&M staff training and manuals?
  • Where is the OPR and BOD verification located in project phases?
  • Who is responsible for digitally recording training materials during the Acceptance Phase?
  • Under a design-build comprehensive HVAC commissioning organizational structure, who does the Owner hire independently?
  • What is the purpose of ASHRAE Guideline 1.1?
  • What does LEED stand for?
  • ASTM stands for which organization?
  • Which phase follows Construction?
  • Who is responsible for performing design reviews during the Design Phase?
  • How many items are listed as the Plan & Spec organizational structure for HVAC commissioning?
  • What does VA PM stand for?
  • What is the hallmark of both AABC and ACG?
  • What does VACO stand for?
  • Which document is aimed at communicating operation and maintenance guidance to users not involved in design and construction?
  • Which contractor is responsible for preparing O&M documentation and the training program in accordance with specification requirements?
  • Which is a commissioning benefit related to indoor environmental quality and occupant productivity?
  • Who creates RTFs in the Construction Phase?
  • Which two phases are identified for the Retro/Re-Commissioning process?
  • In which phase are the document equipment and system start-ups carried out?
  • Who is responsible for Progress Meetings in the Construction Phase?
  • Who is responsible for the Design Phase Attend Pre-Bid Meeting?
  • Which acronym is used to denote the project manager on Veterans Affairs projects?
  • What does the Cx plan typically include?
  • What is the objective of scheduling Commissioning Process activities?
  • What are the two primary documentation requirements for the Construction Phase Commissioning Process?
  • What is the purpose of a Request for Proposal (RFP) in commissioning?
  • FP stands for which term?
  • What does MC stand for?
  • Which role is responsible for approving FPT summaries during the Acceptance Phase?
  • Which abbreviation expands to condenser water supply?
  • Which phase would verify the systems manual?
  • During the design phase of the commissioning process, the CxA verifies the BOD with the _____?
  • Which acronym expands to Building Automation System?
  • During Acceptance Phase, who is responsible for P to P Review Controls?
  • Which phase includes updating the Cx plan?
  • Which statement about TBEs is true?
  • Who is responsible for Construction Phase Approve FPT Updates?
  • BAC stands for which term?
  • During the Design Phase, the OPR is translated into _____?
  • TAB stands for which term in HVAC terminology?
  • Who provides O&M literature and training personnel in the described arrangement?
  • Construction commissioning begins during which phase?
  • What are the five primary documentation requirements for the Pre-Design Phase Commissioning Process?
  • What does VA RE stand for?
  • Which statement best describes the typical organizational structure for commissioning on a building renovation?
  • Which item in the Cx plan relates specifically to individual systems' requirements?
  • The acronym NCA stands for which federal office?
  • ARI or AHRI stands for which organization?
  • What are the two basic ways Commissioning can come about?
  • Which role is responsible for Acceptance Phase Direct FPTs?
  • What is the purpose of ASHRAE Guideline 0?
  • Which abbreviation represents indoor air quality?
  • In retrocommissioning planning phase, what is the next step after the Owner selects the CxA?
  • Periodic re-commissioning is described as identical to re-commissioning except for what circumstance?
  • Which role is described as coordinating electrical installation with mechanical work and documenting SVC progress?
  • What does CHWR stand for?
  • Who is responsible for Construction Phase Pre-TAB Report Review?
  • Comprehensive commissioning can be described as which statement?
  • What does BAS stand for?
  • Which abbreviation stands for Contracting Officer?
  • In project teams, EC stands for which role?
  • Who is responsible for facilitating O&M training during Construction Phase?
  • What does IAQ stand for?
  • Who is responsible for reviewing record documents during the Acceptance Phase?
  • A/E stands for which firm designation?
  • During the Acceptance Phase, who approves and finalizes FPT-related documentation?
  • In which phase are functional performance tests on all HVAC systems carried out?
  • What organizational structure for comprehensive HVAC commissioning does the ACG Cx Guideline follow?
  • New construction commissioning costs as a percentage of total mechanical system construction cost range from which of the following?
  • Who is responsible for preparing the Cx Outline during the Pre-Design Phase?
  • Which role approves SVC updates during the Construction Phase?
  • HVAC commissioning in existing buildings is described as re-commissioning when it is used to diagnose ongoing problems or support a planned preventive maintenance program. Which term is this?
  • New construction commissioning costs as a percentage of total construction cost range from what?
  • Which role is responsible for reviewing O&M documents during Construction Phase?
  • What does the acronym LEED stand for?
  • In the Design Phase, who leads the Kick-Off Meeting?
  • A ______ is a smaller part with an identifiable process or function.
  • Construction HVAC commissioning takes place across which project phases?
  • Which item is included in an RFP that is not typically part of an RFQ?
  • Which option best represents the complete set of tasks when performing a design review?
  • Who is responsible for distributing the FPT summary to project stakeholders during the Acceptance Phase?
  • BDE stands for which term?
  • Which statement describes the impact on turnover when commissioning is applied?
  • Which abbreviation corresponds to Digital Input?
  • Define Retro-Commissioning.
  • What are the two main approaches to commissioning?
  • Equipment operation during functional performance tests (FPTs) is performed by whom?
  • What is Chapter 3 of the ACG Cx Guideline?
  • What does GC stand for?
  • Which statement about metal piping is true?
  • Who is responsible for Construction Phase Witness Install Tests?
  • Construction HVAC Commissioning—New Construction is defined under which chapter reference?
  • CxA stands for which term?
  • Which phase completes the final project Systems Manual?
  • Which statement best describes the sequence of Construction Commissioning activities?
  • The commissioning process does not end until HVAC issues are resolved to the owner's satisfaction and full documentation of the system is provided. Which term completes the sentence?
  • What is the heart of the commissioning process?
  • Which role documents progress (SVCs), coordinates equipment start-up, operate systems as required for FPTing, plans and delivers O&M staff training, and provides O&M manuals/as-builts?
  • What is the second phase of Comprehensive Commissioning as listed?
  • What does CHWS stand for in HVAC context?
  • Who is accountable for document control activities during the Pre-Design Phase?
  • Which phase is associated with the task: 'The owner selects the commissioning authority'?
  • Who is responsible for Construction Phase Facilitate O&M Training?
  • What term describes the opening that allows fluid to flow in or out?
  • Design Phase Draft SVCs responsibility?
  • During Retro/Re-Commissioning Planning, which activity involves gathering needed information if existing documentation does not exist or is inaccurate?
  • Who is responsible for creating RTFs in the Construction Phase?
  • Who is responsible for the Post-Acceptance Phase Cx Report/Addendums?
  • What does the acronym MECH represent?
  • QA stands for which term?
  • What phase does comprehensive HVAC commissioning start?
  • ASHRAE Guideline 1.1 - 2007 is titled what?
  • ISO stands for which organization?
  • Which process forms a protective oxide layer on stainless steel to improve corrosion resistance?
  • What document explains how each criterion in the OPR is implemented in the design?
  • What are the two phases for retrocommissioning in existing buildings?
  • What is continuous commissioning (CCx)?
  • Who is responsible for Post-Acceptance Phase Direct 11th Month Review?
  • Which acronym expands to Associated air balance council?
  • What does HVAC stand for?
  • Which Appendix contains the Sample Format for System Verification and Start-up Checklists?
  • Approximately what percentage of the total cost for construction HVAC commissioning does comprehensive commissioning represent?
  • Who is responsible for Acceptance Phase Write FPT Summaries?
  • Which Appendix contains the Glossary of Acronyms?
  • Which of the following is the first phase of commissioning?
  • In which phase are functional tests implemented?
  • Which metal surface treatment is used to remove impurities such as rust, stains, inorganic contaminants, and scale from ferrous metals, copper, precious metals, and aluminum alloys?
  • ACCA stands for which organization?
  • What does CHWS stand for?
  • Which statement best describes the CxA's role during commissioning?
  • EMS stands for which system?
  • Which entity is responsible for TAB work within the commissioning process?
  • In a design-build project, who bears responsibility for both the detailed design and construction?
  • IPM is an acronym for which role?
  • Which role coordinates the work of design consultants, considers spatial requirements and room naming conventions, conducts regular site observations, and coordinates design changes with the owner and end-users?
  • Who developed the ACG Commissioning Guideline?
  • What does the Design Intent Document (DID) describe?
  • What does USGBC stand for?
  • Who is responsible for Post-Acceptance Phase Document Control?
  • Who is responsible for Construction Phase Site Observations?
  • What does AI stand for?
  • In a globe valve, what best describes the interaction between the disk and the seat?
  • In which phase is the systems manual verified?
  • O&M stands for?
  • Which abbreviation stands for Commissioning Team?
  • Which describes the change-order related benefit of commissioning?
  • What does CxA stand for and what is the CxA's job function?
  • The System Verificaiton Checklist was used in the context of commissioning. Which option is the correct full form?
  • What range is typically cited as the commissioning cost relative to HVAC construction cost?
  • Which of the following terms is a phase in the design and construction process?
  • What does the abbreviation RFP stand for in project procurement terminology?
  • In which phase are construction checklists verified?
  • During which phase are Owner training requirements developed?
  • Seasonal testing occurs in which phase?
  • Which chapter covers the HVAC Commissioning Team?
  • Which Appendix contains the Sample Specification Covering Contractor Responsibilities for HVAC Commissioning?
  • In the Post-Acceptance Phase, who is accountable for Document Control?
  • What is the typical cost range for comprehensive HVAC commissioning as a percentage of the HVAC construction cost?
  • After occupancy, commissioning benefits persist for which duration?
  • What are the primary tools used to coordinate the Construction phase commissioning?
  • Who approves SPQC Reports in the Construction Phase?
  • Who is responsible for the Design Phase Draft SVCs?
  • What does the acronym TBE stand for?
  • Which of the following is not typically listed as a commissioning team member?
  • ECM stands for which term?
  • What does HVAC stand for?
  • The acronym FPTs in the Cx plan stands for what?
  • What is the correct order for the steps in pickling and passivation?
  • What does GOVT stand for?
  • Which statement is true about the claim 'High itch ping indicates a structural flaw in a pipe'?
  • Which of the following is an example of a Commissioning Provider (CP)?
  • Which item is NOT typically included in an RFQ?
  • BEE stands for which term?
  • What does CxT stand for?
  • Which role is responsible for Direct Off-Season FPTs during the Acceptance Phase?
  • Which phrase correctly expands the acronym ME in engineering roles?
  • RFP stands for what in commissioning terminology?
  • Which activity is used to confirm system performance during construction and commissioning?
  • Which phase precedes the Design Phase in the commissioning process?
  • During commissioning, what is done regarding O&M staff training?
  • The opening for fluid flow that allows flow in or out is PORT.
  • Which of the following is NOT among the listed benefits of commissioning?
  • Which activity is NOT part of Construction Commissioning (Planning) activities?
  • Which role is described as reviewing design and providing HVAC training on the design intent?
  • In the Post-Acceptance Phase, who handles Implement FPTs?
  • Define RFQ.
  • CT is the abbreviation for which HVAC component?
  • What is the primary goal of functional performance testing?
  • What does SO stand for?
  • FIM stands for?
  • Which item is explicitly listed as a benefit of commissioning?
  • What does CA stand for?
  • What are the two primary documentation requirements for the Occupancy and Operations Phase?
  • Which of the following is a commissioning requirement to fulfill LEED EA Prereq 1?
  • Which abbreviation stands for heating, ventilating and air conditioning?
  • Which statement best defines commissioning?
  • Who is the leader of the commissioning team?
  • What is the primary purpose of commissioning HVAC systems?
  • Which acronym expands to Industrial Air Quality?
  • Which of the following is a Design-phase activity?
  • What does DO stand for?
  • Who is responsible for Construction Phase Monitor TAB Execution?
  • Who is responsible for Post-Acceptance Phase Implement FPTs?
  • Gate valves have only rising stems.
  • Typically how much does Commissioning cost?
  • Who is responsible for Acceptance Phase Direct Off-Season FPTs?
  • USGBC stands for which organization?
  • Which role is responsible for Acceptance Phase Write FPT Summaries?
  • DDC stands for which term?
  • During what phase should Commissioning be incorporated?
  • In which phase is the systems manual outline-expanded?
  • Who is responsible for the Cx plan during the Design Phase?
  • What does the acronym ATC stand for?
  • OA stands for?
  • Who is responsible for Construction Phase Review 'As-Built' Record?
  • ASTM stands for which organization?
  • Which abbreviation stands for Design Intent Document?
  • What is included in the Pre-design phase for Comprehensive HVAC Cx?
  • What does DI stand for?
  • Which statement describes the primary result of commissioning?
  • Which process applies a micros coating on the metal surface that acts as a protective shield against corrosion?
  • COR stands for?
  • Which acronym stands for the document that records the design intent?
  • Which activities are encompassed by commissioning?
  • Who is responsible for Acceptance Phase Document Control?
  • The purpose of re-commissioning is to diagnose what?
  • Which acronym stands for the organization commonly referred to as the US Green Building Council?
  • What phase is the initial Cx Plan developed?
  • Describe the organizational structure for recommissioning and retrocommissioning in existing buildings.
  • Who is responsible for Acceptance Phase Control SOP Review?
  • What does OA stand for in building systems?
  • What does HVAC stand for?
  • Which element of the Cx plan concerns the purpose and scheduling of coordination meetings?
  • What does Retro-commissioning (RetroCx) refer to?
  • What is Chapter 1 of the ACG Cx Guideline?
  • Which role is responsible for Review Submittals during the Construction Phase?
  • If the Cx Process starts at Design Phase, then the Cx Process activities described for the Pre-Design Phase must be completed (before / after) the Design Phase activities are begun.
  • Which statement best describes Total Building Commissioning (TBCx)?
  • Who is accountable for updating the Construction Phase schedule?
  • New construction commissioning costs as a percentage of total electrical system construction cost range from which of the following?
  • QC stands for which term?
  • Who is responsible for reviewing Cx specifications during the Design Phase?
  • Which entity completes and documents the test and balance work during Construction HVAC Commissioning?
  • What does the acronym DID stand for?
  • The PROJECT HANDOVER MANUAL contains the scope of work for each contractor and details for handover and acceptance.
  • Metal piping is affected by both internal and external temps.
  • Which abbreviation stands for Design Intent Document?
  • What does the acronym USGBC stand for?
  • Which valve type has a spherical internal mechanism with a moving disk and stationary ring?
  • Which entity completes and documents test and balance work?
  • Which item is typically included in the RFP content to address project cost?
  • In a plan and spec approach to HVAC commissioning, which statement best describes the independent hiring?
  • CWR stands for which term?
  • What phase is the OPR developed?
  • ARI stands for which organization?
  • In commissioning terminology, which term refers to the formal check that confirms systems perform as intended?
  • Which acronym denotes the return path for condenser water?
  • What does SDVOSB stand for?
  • What are the three phases for construction HVAC commissioning?
  • What does ASME stand for?
  • Which acronym corresponds to Current Facility Requirements?
  • The Basis of Design is created during which phase?
  • In project documentation, what does RTF stand for?
  • BAS stands for which term?
  • What does ATC stand for?
  • UL stands for which organization?
  • LEED stands for what?
  • During construction, which activity includes verifying BAS install and start-up?
  • What does TAB stand for?
  • Who is responsible for Acceptance Phase Control Program Review?
  • RFI stands for which term?
  • Which of the following is not included in static checks?
  • Who is responsible for document control during the Design Phase?
  • What is the preferred delivery model for commissioning services advocated by the ACG?
  • How many phases are defined in the commissioning process?
  • Which are the four required sections of a Construction Checklist?
  • Which is a post-acceptance off-season activity?
  • Which document describes how each criterion in the OPR is implemented in the design?
  • USGBC stands for which organization?
  • What does CM stand for?
  • What is the stated purpose of starting commissioning at the inception of a building project?
  • Which outcome reflects the potential relationship risk in commissioning projects?
  • What does CT stand for?
  • The commissioning authority should review the design specifications to ensure inclusion of?
  • Which acronym expands to Automatic Temperature Controls?
  • Who is responsible for the Design Phase Kick-Off Meeting?
  • CWS stands for which term?
  • What does the acronym AABC stand for?
  • What does NETA stand for?
  • For building renovations, which statement describes the typical scope of Cx?
  • In which phase are off-season tests carried out?
  • Who is responsible for Construction Phase Document Control?
  • DPC stands for which term?
  • Who is responsible for Construction Phase Approve FPTs?
  • In the Pre-design phase, which activity is explicitly included as part of Comprehensive Commissioning?
  • The abbreviation DOR corresponds to which term?
  • Who designs the pre-design commissioning outline?
  • Which statement about piping temperatures is correct?
  • TBEs are described as independent and possessing the technical expertise to perform which services?
  • Which document defines the owner's requirements for a project and serves as a baseline for design?
  • ASHRAE Guideline 0 - 2005 is titled what?
  • What is the minimum expected content in RFQ and RFP descriptions regarding project scope?
  • TBE stands for which term?
  • Which role provides BOD and DID, responds to RFIs and COs, conducts regular site observations, coordinates design and changes with owner and end-users, reviews O&M manuals/as-builts, and provides HVAC training on the design intent?
  • UL stands for which organization?
  • Who is responsible for digitally recording training during the Acceptance Phase?
  • Does the OPR evolve through each project phase?
  • Which document is produced during the Pre-Design Phase and documents the required items?
  • What does the Basis of Design (BOD) stand for?
  • AI is the abbreviation for which term?
  • Which role distributes FPTs during the Construction Phase?
  • Which acronym corresponds to the measure of air quality inside buildings?
  • The _____ _____ is implemented during the construction phase.
  • Which chapter of the ACG guideline identifies the detailed methodology for Construction HVAC Commissioning?
  • Who is responsible for coordinating and videotaping O&M training, with the contractor providing O&M literature and training personnel?
  • Who is responsible for Construction Phase Monitor Project Team Field Reports?
  • In a Design Build project, the commissioning organizational structure is identified as which entity?
  • Which document defines contractor responsibilities for commissioning?
  • Who is responsible for distributing SPQC Reports during the Construction Phase?
  • What does PMC stand for?
  • What does ISO stand for?
  • Who is responsible for Construction Phase Verify SVC Completion/Spot-Check SVC Accuracy?
  • Establishing the project schedule is a task associated with which phase?
  • Who works directly for the owner and is independent of designers, contractors, vendors, and suppliers on the project?
  • Who is responsible for Post-Acceptance Phase Monitor Warranty Issues Work?
  • Which of the following is NOT an acronym commonly associated with environmental or building performance programs?
  • NFPA stands for which organization?
  • What does PEG stand for?
  • P&ID have compass in left upper corner.
  • What does DDC stand for?
  • Which phase follows Design?
  • In building automation, what does DDC stand for?
  • Who is responsible for Construction Phase Construction Cx Plan?
  • Who supervises or directs the CxT during the Construction Phase?
  • What does CWS stand for?
  • What does DI stand for?